Our engineers completed an independent design review for a transformer foundation at a substation in New York State. The transformer foundation was designed using the owner’s design specifications. Following the review, XCEED signed and sealed the design for the foundation.
You may also like
Eventually, most steel rusts. And most buried pipes are made from steel. So what do you do when your buried pipe gets rusty? What if the pipe leaked?
Using FEA and hand calculations, we were able to help a nuclear utility evaluate RCP Seal Leakoff pipes and components for high temperature and pressure.
We have helped sites prepare for their TI-2515/191 inspections by using a tool we call the Compliance Matrix. Give us a call for more information.
A research institution required a modular, hand-assembled maintenance platform to service a component that is accessed only infrequently. The design challenge included […]