Our engineers completed an independent design review for a transformer foundation at a substation in New York State. The transformer foundation was designed using the owner’s design specifications. Following the review, XCEED signed and sealed the design for the foundation.
You may also like
We diagnosed the failure of a nozzle check valve in an Auxiliary Feedwater System at a power plant. In summary: great valve, wrong application.
A nuclear plant found that they needed to protect pipes from wind driven missiles. We designed a barrier system for them using 3D modeling and FEA.
Custom Tools A tool is a device or handheld implement that aids in accomplishing a task. When tasks become complex, the tools available […]
Helium Covergas System Enhancement Overview: A research facility uses helium covergas to minimize contamination of the process fluid. The existing system, a […]